MBI Case Study

U.N.L.V Thomas and Mack Arena

2006-11-09

Another Success Story

Treatment consisted of a 4” thick acoustical panel partially perforated and manufactured by a well-known manufacturer of acoustical arena materials. The panels were suspended on aircraft cables and a tensioning system that produced the appearance of a traditional acoustical ceiling system.

The installation of specifically engineered ceiling absorbers reduced the reverberation time from over 6 to under 3 seconds.

Acoustic Performance

Project Team

Products Used

>> SOUND | proof